top of page

Construction/traffic alerts

Drivers should be aware of several road projects between now and the end of December:

The City of Arcadia has hired a contract company to work between the hours of 7 a.m. – 5 p.m. to repair damaged concrete, install a signal communication line and signal poles, remove the surface of pavement repave the entire roadway on the following streets:

  1. Santa Anita Avenue from Camino Real to Longden Avenue

  2. Duarte Road to Christina Street

  3. Foothill Boulevard to the 210 Freeway

Drivers and residents should expect traffic control devices, lane closures, equipment operations, materials on the street, driveway closures, and sidewalk closures.  Possible delays may occur when traveling through this area.

Due to the nature of the work, access to resident’s driveways may be disrupted and residents may need to park on the street. The Arcadia Police Department will issue a blanket parking permit to the areas directly impacted by the construction on a daily basis. There is no need to obtain or purchase an overnight parking permit on the nights that your property is impacted. Should your vehicle receive an overnight parking citation in error, please contact the APD Watch Commander at (626) 574-5156.

If you have any questions or need to contact someone about the construction, you may contact the City Engineers Office at (626) 574-5411.

For full details, go to https://local.nixle.com/alert/3912921/?sub_id=282368.

To manage your text and email settings, please log into your account at https://local.nixle.com/accounts/login/.

bottom of page